EV Charger Installation in Bursa
ENGN installs electric vehicle chargers for homes, residential sites and businesses in Bursa. We inspect your installation during a site survey and then prepare a detailed written quote; if you accept it, the survey fee is deducted from the quote. Every installation is done with an electrical project, and a Type A residual current device, circuit breaker and surge protector are included in the installation price. Installation usually takes place within a week of the survey and is finished in a single day.
Home EV charger installation cost
Our average prices for a three-phase home charger (wallbox), by the cable length from the distribution board to the charger (excl. VAT and the charger itself):
| Cable length | Installation | Project | Total |
|---|---|---|---|
| Up to 10 m | TRY 20,000 | TRY 15,000 | TRY 35,000 |
| Up to 25 m | TRY 35,000 | TRY 15,000 | TRY 50,000 |
| Up to 50 m | TRY 50,000 | TRY 15,000 | TRY 65,000 |
The site survey costs TRY 2,500 + VAT; if you accept our quote and have the installation done, it is deducted from the quote, so it is not included in the table.
These are averages. The exact price depends on the cable size and route (in-wall, trunking, underground) and work in the distribution board, and is confirmed after the survey. Distances over 50 m and single-phase installations are priced after the survey. These terms apply from 12.10.2026.
What does the installation price include?
- Running a cable of the right size from the distribution board to the charger (cable and installation materials)
- 40 A Type A residual current device (RCD), 40 A circuit breaker and surge protector (overvoltage and lightning protection) — mandatory
- Mounting the charger on the wall
- Power setting, commissioning and a test charge with your car
Not included: the charger itself, the project fee (TRY 15,000 + VAT), a pedestal if the charger is mounted on a stand, and the optional over/under-voltage protector (priced separately in the quote).
The process: survey, project, installation, test
- Site survey (paid): we check the distribution board, breaker capacity and your electricity contract, measure the cable route and agree the charger position.
- Written quote: the project, materials and labour are quoted in detail in writing. If you accept the quote, the survey fee is deducted from it.
- Payment and installation day: once the quote is accepted, the full amount is transferred to our company account and we agree the installation day with you.
- Project: every installation is done with an electrical project; we do not install without one.
- Installation: the cable is run, the protection devices are fitted in the board and the charger is mounted.
- Test and commissioning: the charger power is set to suit your installation, the app is set up on models that support it, and a test charge is done with your car.
Installation usually takes place within a week of the survey; a home installation is finished in a single day.
What do we check during the site survey?
The site survey is an on-site technical inspection so the installation is done correctly and safely. Our team visits your address and checks:
- Your electricity supply and contracted power: single-phase or three-phase, and whether it can carry the charger's power.
- The distribution board: free space, existing breakers, and room for a type A residual current device, circuit breaker and surge protection.
- Earthing: the condition of the existing earthing and, if needed, a measurement.
- Cable route and distance: where the line will run from the board to the charger and how many metres it will be (the main factor in the installation price).
- Charger location: wall or pedestal, parking layout, cable length, exposure to rain and sun.
- Your car's AC charging power and the right charger power for you (7.4, 11 or 22 kW).
- For residential sites and apartments: common areas, management approval, the building's spare capacity and the need for load balancing.
After the survey we prepare a written quote showing the project, materials and labour separately. The survey fee is TRY 2,500 + VAT and is deducted from the quote if you accept it.
Charger installation at home
In detached houses, villas and homes with a garage, the charger is usually mounted on the garage or car park wall at the nearest suitable point to the board. The shorter the cable, the lower the installation price. Outdoors we make sure the charger and the cable are suitable for outdoor use; where there is no wall, a pedestal is used.
In an apartment's shared car park the installation uses a common area, so the rules for residential sites apply (below).
Chargers in residential site and apartment car parks
Chargers can be installed in shared car parks. According to the Turkish Ministry of Environment and Urbanisation's 2024 opinion, the decision is taken by the owners' meeting with a majority of both owners and land shares, no building permit is required, and the distribution company (UEDAŞ in Bursa) must approve. Please check the exact legal position with your management and lawyer.
When several chargers are installed, the building's electrical capacity is shared. Chargers with dynamic load balancing (Bemis Charger Plus 2 and Charger Pro 2) allow more chargers on the existing supply; MID-metered versions let consumption be allocated per user. We plan the installation with the management and report how many chargers can be installed and what infrastructure is needed.
There is no fixed price for residential sites; we give a written quote after the survey.
Charger installation for businesses
We install chargers for employees, fleets and customers in office, factory, hotel, shop and shopping centre car parks. If user and consumption tracking is needed, we recommend OCPP-capable chargers with a SIM card (GSM) and MID meter. We also survey and quote DC fast charger projects for businesses.
There is no fixed price for businesses; we give a written quote after the survey.
Single-phase or three-phase? 7.4, 11 and 22 kW
- Single-phase supply: up to 7.4 kW (32 A).
- Three-phase 16 A: 11 kW — the most common home setup and enough for most cars.
- Three-phase 32 A: 22 kW — only makes a difference for cars that support 22 kW AC charging; the installation and supply must carry this power.
A car never draws more than it supports: if your car's AC charging power is 11 kW, a 22 kW charger will not charge it faster. We decide the right power during the survey based on your supply and car.
Service area
We install in central Bursa and nearby districts: Osmangazi, Nilüfer, Yıldırım, Gürsu, Kestel and Mudanya. For other districts, please call us to check. We ship products to other provinces but do not install there.
This includes, for example, Görükle, Özlüce, Ataevler, Beşevler, Fethiye, İhsaniye and Balat in Nilüfer; Çekirge, Hamitler, Demirtaş and Soğanlı in Osmangazi; Siteler and Yavuz Selim in Yıldırım; and Güzelyalı in Mudanya.
Why ENGN?
- We have been doing electrical contracting and lighting work in Bursa since 2010.
- We have installed more than 100 EV chargers.
- We are an authorised Bemis dealer and use Legrand protection devices.
- Every installation is done with a project; workmanship carries a 5-year warranty (the charger is covered by the manufacturer's warranty, 2 years for Bemis).
- You can see the chargers and discuss your installation in person at our store in Nilüfer.
How to request it
- Buy the charger on our site and, if your delivery address is in Bursa, tick “I'd like a charger site survey” at checkout; the survey fee is added to your order total and our team will call you to arrange it.
- If you'd like a survey before buying a charger, you can buy the “EV Charger Site Survey (Bursa)” service on its product page.
- You can also request a survey via the contact page, by phone or on WhatsApp.
Our average price for a three-phase home charger is about TRY 20,000 for up to 10 m of cable from the distribution board, about TRY 35,000 for up to 25 m and about TRY 50,000 for up to 50 m (excl. VAT and the charger). The project fee (TRY 15,000 + VAT) is added; for example, the total for 10 m is about TRY 35,000 + VAT. The exact price is given in a written quote after the survey.
A suitable electricity supply and distribution board, a cable from the board to the charger, a Type A RCD, a circuit breaker, a surge protector and an electrical project. We check your supply and board during the survey and list anything missing in the quote. In apartment buildings, a management decision is also needed.
Yes. The site survey costs TRY 2,500 + VAT. After the survey we prepare a detailed written quote; if you accept it and have the installation done, the survey fee is deducted from the quote.
Yes, we do not install without an electrical project. The project fee is TRY 15,000 + VAT and is added to the installation price.
Every installation requires a 40 A Type A residual current device (RCD), a 40 A circuit breaker and a surge protector (overvoltage and lightning protection); these are included in the installation price. An over/under-voltage protector is optional and priced separately in the quote.
Installation usually takes place within a week of the survey; a home installation is finished in a single day. For residential sites and businesses, the timing is set during the survey.
When you accept the written quote, the full quoted amount is transferred to our company account; we then agree the installation day with you.
Yes. On single phase the charging power is at most 7.4 kW. We look at single-phase solutions or switching to a three-phase supply during the survey; single-phase installations are priced after the survey.
We check your contracted power and distribution board during the survey. If it isn't enough, the charger can run at a lower power setting, or a power increase can be requested from UEDAŞ, Bursa's distribution company.
Yes. According to the Ministry's 2024 opinion, the owners' meeting decides with a majority of owners and land shares, no building permit is required, and the distribution company must approve. We plan the installation with the management and give a written quote after the survey.
Under Turkey's Car Park Regulation (2021), new buildings with 20 or more parking spaces must provide chargers for at least 5% of them, and shopping centres and public car parks for 10%. There is no general obligation for existing buildings; see our building rules guide for details.
For residential sites the cost depends on the number of chargers, the distance from the board to the car park, the building's electrical capacity and the need for load balancing, so we do not give a fixed price. We prepare a detailed written quote after the survey.
Installation should be done with an electrical project by an authorised electrical contractor. At ENGN we install with a project in Bursa, fit the protection devices to the standards and give a 5-year workmanship warranty.
For one car at home, the Bemis Charger Plus 2, or the Charger 2 if budget comes first; for residential and business car parks, the Charger Pro 2 with load balancing and a GSM option. We choose the best model together based on your car's AC power and your installation.
Yes. Chargers we install carry a 5-year workmanship warranty; the charger is also covered by the manufacturer's warranty.
From our installations



→ Home EV charger installation cost 2026: prices and cost factors
What our customers say
5.013 reviews
They do premium quality work, they are reliable, I definitely recommend them.
Quality people who are competent and do their job with love, who work reliably, quickly, practically and cleanly, and who deserve the identity of solution-oriented tradesmen. I definitely recommend it.
I can say that in the work we had done, quality and clean workmanship were prioritized, and they did their jobs properly. I recommend them to everyone.