EV charging station rules for buildings in Turkey (2026)
The Journal · Oct 7, 2026
EV charging station rules for buildings in Turkey (2026)
Written by Engin Demirel · Electrical technician, master instructor · 12 years of experience
Short answer: In Turkey, new buildings with 20 or more mandatory parking spaces must equip at least 5% of those spaces for electric vehicle charging (Parking Regulation). In existing apartment blocks and residential complexes, a majority decision of the owners (by number and land share) is enough to install chargers in the shared car park; no building permit is needed, but the electricity distribution company must approve. Chargers used only by residents and not charged for separately do not need an EPDK licence.
Which rules apply?
Charging units in Turkish buildings are governed by three sets of rules:
- Parking Regulation (Ministry of Environment, Urbanisation and Climate Change; amended 25 March 2021): mandatory chargers in new buildings and shopping-centre car parks.
- The Ministry's arrangement of 7 August 2024: easier installation in existing apartment blocks (voting majority, permit, electricity approval).
- Regulation on Charging Services for Electric Vehicles (EPDK, 2 April 2022): paid, public charging and licensing.
Mandatory chargers in new buildings
Under the Parking Regulation, in new buildings with 20 or more mandatory parking spaces, at least 5% of those spaces are arranged for electric vehicle charging, with at least one charging unit. In district and public car parks and shopping-centre car parks the minimum is 10%; shopping centres over 30,000 m² need at least one, and those over 70,000 m² at least two fast (DC) chargers.
The requirement applies to new buildings; there is no retroactive obligation for existing ones. In existing buildings installation is optional and follows the simplified rules below.
Installing in the shared car park of an apartment block
- Decision: a majority of the owners by number and land share is enough. The former four-fifths majority is no longer required.
- Permit: charging units that do not create an enclosed space, are installed as a block and have fire and electrical protection need no building permit.
- Electricity approval: the approval of the local distribution company (UEDAŞ in Bursa) is always required. If the building's supply is not sufficient, a capacity increase or a separate charging supply is needed.
- Scope: this simplification is for residents' own use. Paid charging for outside vehicles is a commercial activity and falls under EPDK rules.
In practice, the owners' decision should also record the charger locations, cable routes, metering (separate consumption per flat) and how costs are shared.
Installing at your own parking space
If the parking space is registered as an annex of your flat, no change is made to the building's electrical installation and other flats and common areas are not affected, no owners' decision is needed. If the line passes through common areas, the main panel is modified or the building's supply is used, a decision of the management and owners is still required.
When is an EPDK licence required?
No EPDK licence is needed for chargers used only by residents without a separate charging fee. Public, paid charging must be offered through a licensed charging network operator. If you want to bill residents by use, chargers that measure per-user consumption (RFID card, app, MID meter or OCPP management) make it much easier.
Under the amendment to the Charging Service Regulation published in the Official Gazette on 23 March 2026, private, non-commercial chargers installed only for your own use or for residents do not have to join a charging network. If residents are charged per use, this counts as a commercial charging service and the chargers must be in the network of a licensed charging network operator; the price may only be set per kWh, and no other fee of any name may be charged apart from announced reservation and occupancy fees. Confirm your own case with EPDK or an expert before installing; details in the guide opening a charging station.
Technical points for the installation
- Dedicated line and protection: each charger needs its own line, the right cable cross-section, a breaker and residual-current protection (Type B, or 6 mA DC detection in the charger).
- Load management: with several chargers, dynamic load balancing keeps the building's supply from being exceeded.
- Metering: if fed from a shared supply, each charger's consumption should be tracked (MID-metered models or OCPP management).
- Location: fire exits and manoeuvring areas must stay clear; cables and chargers should be protected against impact.
Installation for apartment blocks in Bursa
ENGN carries out site surveys in Bursa (TRY 2,500 + VAT, deducted from the quote if we do the work): we check the building's supply, panel and cable route and prepare the written quote and technical note for the owners' meeting. Installation prices are about TRY 20,000 (up to 10 m), TRY 35,000 (up to 25 m) and TRY 50,000 (up to 50 m) excluding VAT, depending on cable length; we don't install without an electrical project, and the project fee (TRY 15,000 + VAT) is added separately. A 40 A Type A RCD, a 40 A circuit breaker and a surge protector are included in the installation price.
- → EV charger installation in Bursa and prices
- → Home EV chargers
- → Home EV charger installation cost
- → What is OCPP?
- → Bemis Charger Pro 2 22 kW EV Charger for Residential Sites and Businesses
Note: This article is for general information and is not legal advice. Regulations may change; check the current rules and your building's management plan before installation.
Frequently asked questions
How many owners must agree to install a charger in an apartment block?
For a charger in the shared car park, a majority of the owners by number and land share is enough. The former four-fifths majority is no longer required.
Do I need the management's permission to install a charger at my own parking space?
If the space is an annex of your flat, the building's electrical installation is not changed and other flats and common areas are not affected, no owners' decision is needed. If the line passes through common areas or uses the building's supply, a management decision is required.
Is a building permit required for a charger in a residential car park?
No building permit is needed for units that do not create an enclosed space, are installed as a block and have fire and electrical protection. The distribution company's approval is always required.
Are chargers mandatory in new buildings?
Yes. In new buildings with 20 or more mandatory parking spaces, at least 5% of those spaces are arranged for charging, with at least one charging unit. In shopping-centre and public car parks the minimum is 10%.
Does a residential charger need an EPDK licence?
Not if it is used only by residents without a separate fee. Public, paid charging requires a licensed charging network operator.
Who pays for the charger's electricity?
If it is fed from a shared supply, MID-metered or OCPP-managed chargers are recommended to split consumption by user; sharing is set in the owners' decision. A charger on your own flat's supply is billed to you.